The implementation of the photovoltaic system in Puerto Banús (Marbella) for a company that required significant capacity to supply both their office needs and electric vehicles was carried out in a period of ten days. The installation was done on the building's roof with a strategic east-west orientation designed to maximize solar energy capture during the day. This approach not only meets the immediate energy needs of the company but also demonstrates our commitment to efficient and sustainable solutions. This installation required an OCA inspection.
Quality
44,69 kW
Company with a power capacity of 43 kW.
Solaredge
Instalación de inversor Solaredge trifásico de 66 kW.
JA Solar
Installation of 82 JA Solar panels with a capacity of 545 Wp each.
Average savings of 57% on electricity consumption.
This results in a 68% savings on the electricity bills.